Chapter 2
SharpSwitch™ PCIE-9205 Installation and Use (6806800U18D)
35
Hardware Preparation and Installation
This chapter provides information on unpacking and inspecting the card procedures and safety
precautions to be followed while handling the card. The environmental, thermal, and power
requirements, and the installation and removal procedures of the card are also explained in this
chapter.
2.1
Unpacking and Inspecting Card
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment:
One SharpSwitch™ PCIE-9205 card.
One printed copy of
Quick Start Guide.
One printed copy of
Safety Notes Summary.
Any optional items ordered.
2. Check your shipment and report any damage or differences to the Contact Center
at
.
Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the card can damage
circuits or shorten their life.
Make sure that you are working in an ESD-safe environment, before touching the card
or electronic components.
Summary of Contents for SharpSwitch PCIE-9205
Page 1: ...SharpSwitch PCIE 9205 Installation and Use P N 6806800U18D March 2018 ...
Page 6: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D 6 Contents ...
Page 8: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D 8 List of Tables ...
Page 10: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D 10 List of Figures ...
Page 22: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D Safety Notes 22 ...
Page 30: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D Sicherheitshinweise 30 ...
Page 62: ...Controls Indicators and Connectors SharpSwitch PCIE 9205 Installation and Use 6806800U18D 62 ...
Page 68: ...Functional Description SharpSwitch PCIE 9205 Installation and Use 6806800U18D 68 ...
Page 86: ...BIOS SharpSwitch PCIE 9205 Installation and Use 6806800U18D 86 ...
Page 101: ......