4 - Covering  >> Using Arma-Chek D Covering

APPLICATION MANUAL   

 

D

© ARMACELL UK LTD.

Covering Of Insulated Objects >> Using Arma-Chek D Covering

   

  

 

2.  When the covering has been smoothed in position, 
   mark  the  overlaps  position  on  the  under  face  area 
   with  a  pen  and  continue  to  apply  adhesive  on  the 
   overlap and the under-laying covering, allow to touch 
   dry, ”use fi ngernail test“ and fi x down making sure the 
   overlap is completely fi xed.
3.  Seal the longitudinal seam of the covering with the 
   correct  Armafl ex  adhesive.  Continue  to  install  the 
   covering along the pipework allowing for a minimum 
   50 mm overlap on all ”butt“ joints.

   

 

Note:

a.  For  outdoor  application  check  the  adhesive  seams 
   and joints on the covering for any defects and rectify 
   as required. Apply a bead of Arma-Chek mastic along 
   all seams and joints. Always smooth in the mastic on 
   all the seams and joints to allow maximum bonding to 
   occur.
b.  Allow for ”watershed“ where applicable on all external 
   locations.
c.  Allow  36  hours  curing  time  before  turning  on  the 
   equipment.

Procedures  for  pipework  with  outer  diameter  (in-

cluding insulation thickness) ≥ 500 mm

Same application as for outer diameter < 500 mm, but: 
All  over  adhesive  coverage  is  required.  Consider  also 
„General procedures“, topic 3 (see this page).
Note: Check adhesive specifi cation table when installing 
Arma-Chek D covering (see page 21 of this manual).

GENERAL PROCEDURES

1.  Ensure the Armafl ex insulation surface is clean, dry, 
   and  free  from  all  oils,  greases  and  other  contami-
   nants,  with  all  the  seams  and  joints  secured  with 
   Armafl ex  adhesive.  Ensure  that  Armafl ex  installa-
   tion  procedures  are  followed;  ensure  there  are  no 
   gaps present in all the seams and joints.
   

Note:

 Refer to the Armafl ex Installation Manual at all 

   times.
2.  For Arma-Chek D covering adhesive is only required 
   on the Armafl ex and on the overlapping area. A short 
   pile sheepskin paint roller may be preferred on large 
   circular and fl at surface areas.
3.  It  is  recommended  to  fully  adhere  Arma-Chek  D 
   covering  for  cylindrical  bodies  with  pipe  outer  dia-
   meter > 500 mm.
   

Note:

 When Arma-Chek D covering is applied onto a

    HT/Armafl ex  substrate,  all-over  adhesive  coverage 
   is  not  required  on  the  HT/Armafl ex  or  the  covering 
   surfaces. Only the covering seam and join overlaps 
   require  adhesive  (even  if  pipe/duct  has  an  outer 
   diameter greater than 500 mm).
4.  If  all-over  adhesive  is  applied  for  the  overlapping 
   regions  of  the Arma-Chek  D  covering  material  it  is 
   not necessary to use self-adhesive tape(for internal 
   application) or the 100 mm width Arma- Chek D strips 
   (for external application) if the covering is fully glued 
   on the surface.

CYLINDRICAL BODIES

(pipes, vessels, ductwork etc.)

Determine the circumference measurement of the insu-
lated pipeline with an additional allowance of 50 mm for 
the overlap.
Proceed to cut the amount of pieces required, on a clean 
fl at surface.

Procedures  for  pipework  with  outer  diameter  (in-

cluding insulation thickness) < 500 mm

1.  Positioning of the covering material: Apply a minimum 
   50  mm  glue  line  with  the  correct  type  of  Armafl ex 
   adhesive to the surface of the Armafl ex and the Arma-
   Chek D covering. 
   Position  the  Arma-Chek  D  covering  along  this  line 
   and fi x to the Armafl ex. Ensure the covering is ”in-line“ 
   and  in  the  desired  position.  Apply  pressure  and 
   smooth the covering around the insultions circumfer-
   ence  avoiding  any  ”air  pockets“.  Use  a  clean  paint 
   roller  for  this  job.  (Overlapping  of  Arma-Chek  D 
   covering material: minimum 50 mm).

D (15)

Summary of Contents for Arma-Chek D

Page 1: ...application manual ARMA CHEK D application manual application manual ARMA CHEK D D...

Page 2: ...application manual ARMA CHEK D ARMACELL UK LTD D APPLICATION MANUAL D...

Page 3: ...ways use the correct speci ed Arma ex adhesives Do not assume they will always do the same job If in doubt consult the Armacell technical department local agent On external installations always ensure...

Page 4: ...ntire surface smoothing the covering round making sure there are no air pockets present Always check for alignment and avoid creases and crinkles during that time e If the surfaces are left to dry too...

Page 5: ...clean the seams and joints use the Arma ex cleaner Peel back release paper and cover the entire seam line with an additional 50 mm overlap where appli cable applying pressure during the installation C...

Page 6: ...General Working with Arma Chek D ARMACELL UK LTD D APPLICATION MANUAL 1 General Working with Arma Chek D 4 D...

Page 7: ...d x using the factory applied adhesive strip 5 Use correct Arma ex adhesive to secure the longi tudinal seam Apply on one side only Always remember to stagger longitudinal seams 6 Secure the butt end...

Page 8: ...seam of the throat using 20 mm wide Arma Chek S Butyl Tape Always ensure the tape is applied such that a watershed is achieved Note In some circumstances it may be preferable to fabricate segment ttin...

Page 9: ...ARMAFLEX TUBE Note Yellow lines indicate where cuts are to be made Always follow instructions related to the application of pre coated Arma Chek S tubes as stated in the above procedures relating to a...

Page 10: ...over the tting The oversize tting should extend by the wall thickness of the over sized fabrication minimum of 25 mm is required over the adjoining insulation On the butt end of the adjoining insulat...

Page 11: ...ness 1 mm 1 This table is valid for ambient conditions of 5 C For lower applica tion temperatures the rigidity and tension of the sheet material can increase thus lead ing to other conditions than men...

Page 12: ...e by drawing the half elevation on the edge of the Arma Chek sheet 4 Completed Arma Chek pipe reducer made of factory coated Arma Chek Dsheet material with a straight nish ECCENTRIC REDUCER FLAT BACK...

Page 13: ...meter of the connected pipes 2 x ins thickness Note 5 mm must be added to the jacket height deter mined 5 mm must be subtracted from all measur ments for openings 2 Cross section A A Determine the cir...

Page 14: ...borders directly on the ange with a 100 mm wide strip of Arma ex Determine the dimensions of the ductwork surface to be insulated On bends the inner throat and outer dimensions are determined using st...

Page 15: ...HANGING DUCTWORK Use the Arma x duct supports to optimize the preven tion of thermal bridging and simplify the hanging of duct work VESSELS 1 First insulate the vessel jacket with Arma Chek D pre coat...

Page 16: ...Insulating with Arma Chek D Using Pre Covered Sheets ARMACELL UK LTD D APPLICATION MANUAL 3 Insulating with Arma Chek D Using Pre Covered Sheets 14 D...

Page 17: ...are no gaps present in all the seams and joints Note Refer to the Arma ex Installation Manual at all times 2 For Arma Chek D covering adhesive is only required on the Arma ex and on the overlapping ar...

Page 18: ...ongitudinal seam of the covering with the correct Arma ex adhesive Continue to install the covering along the ductwork allowing for a 50 mm overlap on all butt joints DUCTWORK BENDS IRREGULAR SHAPES 1...

Page 19: ...seg ment of the assembled segment bend and determine the circumference 2 Transfer the circumference measurement U to the Arma Chek Dcovering material and draw in a line dividing it in half Now add a 5...

Page 20: ...pipe and transfer this to the covering material Halve the circumference 3 Transfer segment width for the throat seam to each end of the circumference drawn and the segment width for the back of the be...

Page 21: ...a pair of scissors OFFSET ANGLES 1 Determine the circumference U of the Arma ex in sulated offset angle the maximum a and minimum b height and the Arma ex insulated outer diameter of the pipe D to wh...

Page 22: ...material to the insulation material Secure the seams with Arma Chek D self adhesive tape on indoor applications with 100 mm wide strips of the covering material applied with all over adhesive coverag...

Page 23: ...eathering overlap length minimum equal to the insulation thickness of the non covered area Method 2 1 Measure the following diameters of the end cap a smaller insulated outer diameter of insulated bod...

Page 24: ...ARMACELL UK LTD D APPLICATION MANUAL 4 Covering Using Arma Chek D Covering Covering Of Insulated Objects Using Arma Chek D Covering 22 D...

Page 25: ...application manual ARMA CHEK D ARMACELL UK LTD APPLICATION MANUAL D D...

Page 26: ...ightweight and easy to apply insulation system resistant to mechanical impact D D Arma Chek R The insulation system with extra system security that minimises the risk of under insulation corrosion UIC...

Reviews: