background image

21

Preventive Maintenance Schedule

The Semi-Permanent Rack is subject to wear and the following actions must be performed

when  specified  to  ensure  that  the  product  remains  within  its  original  manufacturing

specifications.

The  Semi-Permanent  Rack  must  be  inspected  by  a  qualified Arjo  technician  on  an  annual

basis to ensure the proper functioning of its components, as well as the safety of the patients

and care givers that use the Semi-Permanent Rack. Please contact your local representative

to make arrangements.

Cleaning

To clean the 

Semi-Permanent Rack

, wipe it down with a damp cloth using warm water and

mild detergent. 

To ensure a smooth rolling surface for the trolley wheels, clean the inside of the track every

four months. To do so, insert a damp cloth in the opening and slide it from one end of the track

to the other.

POINTS TO BE INSPECTED BY

USER/SERVICE TECHNICIAN

FREQUENCY

Annually or 1400 cycles

Monthly

Before every use

  

Inspect for evidence of external damage or missing parts.

Make sure that all bolts and nuts are properly tightened.

Make sure that the levelling feet are properly adjusted.

Make sure that the track is properly assembled to the posts.

Make sure that all posts are straight.

Clean the inside of the tracks to make sure that there is no dust or grease build-

up inside the tracks.

Make sure that the trolleys move freely along the tracks.

WARNING: Safety related maintenance and authorized service must be carried out by

qualified personnel, fully trained in servicing procedures by Arjo and equipped with

the  correct  tools  and  proper  documentation,  including  the  parts  list  and  service

manual. Failure to meet these requirements could result in personal injuries and/or

unsafe equipment.

WARNING:  The  points  on  this  checklist  are  the  minimum  the  manufacturer

recommends.  In  some  cases  more  frequent  inspections  should  be  carried  out.

Continuing to use the Semi-Permanent Rack without conducting regular inspections

will seriously compromise the user's and patient’s safety. Preventive maintenance

specified in this manual can prevent accidents.

WARNING:  If  any  of  the  above  inspection  points  fails,  DO  NOT  USE  the  Semi-

Permanent Rack until appropriate corrective action is taken.

NOTE: If the product does not work as intended, immediately contact your local Arjo

agent for support.

CAUTION: Do not use phenol, chlorine or other types of solvent that may damage the

finish.

Care and Maintenance

Summary of Contents for KWIKtrak 4-Post

Page 1: ...ASSEMBLING INSTRUCTIONS KWIKtrak 4 Post Semi Permanent Rack Assembly 001 11950 EN rev 5 01 2021...

Page 2: ...ing to the Arjo group of companies Arjo 2021 As our policy is one of continuous improvement we reserve the right to modify designs without prior notice The content of this publication may not be copie...

Page 3: ...Permanent Rack System 8 Sold Seperately 9 Required Tools 9 Assembling Instructions 10 Assembling the 4 Post Rack 10 Post Assembly Corner Brackets 10 Post Assembly Levelling Feet 11 End Stoppers 12 Fas...

Page 4: ...ther appliances supplied by Arjo Furthermore unauthorized modifications on any Arjo equipment may affect its safety Arjo will not be held responsible for any accidents incidents or deficiencies of per...

Page 5: ...Receipt Upon receipt of the equipment verify it against the packing list to make sure that it is complete and inspect the equipment for possible damage due to shipping If there is any damage DO NOT US...

Page 6: ...e present see table on page 8 Follow the assembly procedure sequence Use each and every one of the parts DO NOT leave any out This equipment must be used by a caregiver with proper training to work wi...

Page 7: ...talogue number Indicates a potential risk refer to the Instructions for Use IFU for details Manufacturer s serial number Safe Working Load Indicates the maximum load for which the device is rated for...

Page 8: ...track X 2 4 Parallel track Y 2 5 Autolock end stoppers 6 6 XY trolley 2 7 Mobile track X 1 8 Plastic end cap 6 10 or 12 according to model Plastic end cap halves for kit including H140 rails 2 or 6 ac...

Page 9: ...ignation Sold Separately Fig 3 Required Tools 5 mm Allen key 17 mm hexagonal key 6 mm Allen key Bubble level 8 mm Allen key 700 15510 700 10650 Trolley for portable lift Charger interface for fixed ce...

Page 10: ...s Verify that the lockwashers are installed at their proper place as shown Fig 4 2 Fasten the corner bracket assembly to the top of each post Do so for all four posts Properly insert the two screws M1...

Page 11: ...30 does not protrude into the inner cavity of the levelling feet before attempting to insert the posts Fig 5 4 Adjust the bottom part of the levelling feet so as to leave about 10 mm 3 8 in for later...

Page 12: ...ackets make the installation safer by greatly reducing the risk of the mobile track shifting from its position in the event that the end of the track should be subjected to a violent impact prevent th...

Page 13: ...rly inserted on the correct side see Fig 8 Fig 8 6 Choose two of the four fixed track sections that will hold the trolleys for the mobile track see Fig 2 item 4 7 Slide the individual XY kit trolleys...

Page 14: ...careful not to allow the trolleys for the mobile track or the end stoppers to fall out Fig 10 9 Make sure that the fixed tracks are positioned flush with the outer edges of the corner bracket of the...

Page 15: ...the ground while the other adjusts the level by rotating the bottom of the levelling feet until the horizontal track is perfectly horizontal 16 Move the bubble level to the next horizontal track and r...

Page 16: ...bile track that allows the lift to move within the area spanned by the 4 Post system Once all four fixed tracks are joined to their corresponding posts 17 Slide the mobile track onto the wheeled troll...

Page 17: ...uctions Fig 14 Once the mobile track is in place 18 Straighten the track so that it is squared to the fixed tracks 19 Tighten both M12 bolts on each trolley with a 19 mm wrench see Fig 15 Fig 15 END S...

Page 18: ...fixed track evenly If not loosen the setscrews readjust the mobile track and retighten the setscrews see Fig 15 21 Slide the autolock end stoppers on the mobile track to a distance of 25 mm 1 in from...

Page 19: ...pper to the track Insert the end stopper into the track and test the end stopper by trying to push it back out of the track The stopper should not be able to move Firmly tighten the setscrews using a...

Page 20: ...20 Assembling Instructions Fig 19 Fig 20 End stopper Install the ceiling lift before installing the second end stopper Torque to 20 N m 15 lbf ft...

Page 21: ...ted Make sure that the track is properly assembled to the posts Make sure that all posts are straight Clean the inside of the tracks to make sure that there is no dust or grease build up inside the tr...

Page 22: ...lley does not move smoothly in the track Is the track clean Clean the track with a damp cloth Is the trolley centred in the track Re centre the trolley Is the trolley damaged Replace the trolley The p...

Page 23: ...mm 140 mm track 2414 mm 180 mm track A B B A Product Codification 9 9 0 X X X X A B 30 3 0 m 10 ft 35 3 5 m 11 5 ft 40 4 0 m 13 ft 45 4 5 m 14 75 ft 30 3 0 m 10 ft 35 3 5 m 11 5 ft 40 4 0 m 13 ft 45 4...

Page 24: ...Intentionally left blank...

Page 25: ...Intentionally left blank...

Page 26: ...Intentionally left blank...

Page 27: ...FZ LLC 2 FH WK ORRU 4 XLOGLQJ 1RUWK 7RZHU Dubai Science Park Al Barsha South P O Box 11488 Dubai United Arab Emirates Direct 971 487 48053 Fax 971 487 48072 Email Info ME arjo com NEDERLAND Arjo Nede...

Page 28: ...QRPLF SDWLHQW KDQGOLQJ SHUVRQDO K JLHQH GLVLQIHFWLRQ GLDJQRVWLFV DQG WKH H HFWLYH SUHYHQWLRQ RI SUHVVXUH XOFHUV DQG YHQRXV WKURPERHPEROLVP ZH KHOS SURIHVVLRQDOV DFURVV FDUH HQYLURQPHQWV WR FRQWLQXDOO...

Reviews: