background image

15

Assembling Instructions

 Fig. 12

11. Slide the four individual autolock end stoppers towards the four ends of the two parallel

tracks, to prevent the mobile XY track from running into any of the corner brackets.

12. Tighten the setscrews on the end stoppers using a 6 mm Allen key. Make sure that the

lockwashers are installed in their correct positions.

13. Insert the white plastic caps onto the ends of the 4 tracks.

Levelling the assembly

14. Place a bubble level on one of the horizontal tracks.

15. The first person can raise the posts from the ground while the other adjusts the level by

rotating the bottom of the levelling feet until the horizontal track is perfectly horizontal.

16. Move the bubble level to the next horizontal track and repeat these steps until the entire

rack is perfectly levelled.

CAUTION: Make sure that the lockwashers are installed at the proper locations. 

8 mm Allen key

NOTE: You must level the assembly before mounting the mobile track to the system.

Two people are needed to level the Semi-Permanent Rack system. 

Do not place hands under the posts. Grab the levelling feet by the side to prevent the

risk of fingers being pinching when performing adjustments.

Do not force the levelling feet to extend beyond their maximum adjustable height of

25,4 mm (1 in).

Summary of Contents for KWIKtrak 4-Post

Page 1: ...ASSEMBLING INSTRUCTIONS KWIKtrak 4 Post Semi Permanent Rack Assembly 001 11950 EN rev 5 01 2021...

Page 2: ...ing to the Arjo group of companies Arjo 2021 As our policy is one of continuous improvement we reserve the right to modify designs without prior notice The content of this publication may not be copie...

Page 3: ...Permanent Rack System 8 Sold Seperately 9 Required Tools 9 Assembling Instructions 10 Assembling the 4 Post Rack 10 Post Assembly Corner Brackets 10 Post Assembly Levelling Feet 11 End Stoppers 12 Fas...

Page 4: ...ther appliances supplied by Arjo Furthermore unauthorized modifications on any Arjo equipment may affect its safety Arjo will not be held responsible for any accidents incidents or deficiencies of per...

Page 5: ...Receipt Upon receipt of the equipment verify it against the packing list to make sure that it is complete and inspect the equipment for possible damage due to shipping If there is any damage DO NOT US...

Page 6: ...e present see table on page 8 Follow the assembly procedure sequence Use each and every one of the parts DO NOT leave any out This equipment must be used by a caregiver with proper training to work wi...

Page 7: ...talogue number Indicates a potential risk refer to the Instructions for Use IFU for details Manufacturer s serial number Safe Working Load Indicates the maximum load for which the device is rated for...

Page 8: ...track X 2 4 Parallel track Y 2 5 Autolock end stoppers 6 6 XY trolley 2 7 Mobile track X 1 8 Plastic end cap 6 10 or 12 according to model Plastic end cap halves for kit including H140 rails 2 or 6 ac...

Page 9: ...ignation Sold Separately Fig 3 Required Tools 5 mm Allen key 17 mm hexagonal key 6 mm Allen key Bubble level 8 mm Allen key 700 15510 700 10650 Trolley for portable lift Charger interface for fixed ce...

Page 10: ...s Verify that the lockwashers are installed at their proper place as shown Fig 4 2 Fasten the corner bracket assembly to the top of each post Do so for all four posts Properly insert the two screws M1...

Page 11: ...30 does not protrude into the inner cavity of the levelling feet before attempting to insert the posts Fig 5 4 Adjust the bottom part of the levelling feet so as to leave about 10 mm 3 8 in for later...

Page 12: ...ackets make the installation safer by greatly reducing the risk of the mobile track shifting from its position in the event that the end of the track should be subjected to a violent impact prevent th...

Page 13: ...rly inserted on the correct side see Fig 8 Fig 8 6 Choose two of the four fixed track sections that will hold the trolleys for the mobile track see Fig 2 item 4 7 Slide the individual XY kit trolleys...

Page 14: ...careful not to allow the trolleys for the mobile track or the end stoppers to fall out Fig 10 9 Make sure that the fixed tracks are positioned flush with the outer edges of the corner bracket of the...

Page 15: ...the ground while the other adjusts the level by rotating the bottom of the levelling feet until the horizontal track is perfectly horizontal 16 Move the bubble level to the next horizontal track and r...

Page 16: ...bile track that allows the lift to move within the area spanned by the 4 Post system Once all four fixed tracks are joined to their corresponding posts 17 Slide the mobile track onto the wheeled troll...

Page 17: ...uctions Fig 14 Once the mobile track is in place 18 Straighten the track so that it is squared to the fixed tracks 19 Tighten both M12 bolts on each trolley with a 19 mm wrench see Fig 15 Fig 15 END S...

Page 18: ...fixed track evenly If not loosen the setscrews readjust the mobile track and retighten the setscrews see Fig 15 21 Slide the autolock end stoppers on the mobile track to a distance of 25 mm 1 in from...

Page 19: ...pper to the track Insert the end stopper into the track and test the end stopper by trying to push it back out of the track The stopper should not be able to move Firmly tighten the setscrews using a...

Page 20: ...20 Assembling Instructions Fig 19 Fig 20 End stopper Install the ceiling lift before installing the second end stopper Torque to 20 N m 15 lbf ft...

Page 21: ...ted Make sure that the track is properly assembled to the posts Make sure that all posts are straight Clean the inside of the tracks to make sure that there is no dust or grease build up inside the tr...

Page 22: ...lley does not move smoothly in the track Is the track clean Clean the track with a damp cloth Is the trolley centred in the track Re centre the trolley Is the trolley damaged Replace the trolley The p...

Page 23: ...mm 140 mm track 2414 mm 180 mm track A B B A Product Codification 9 9 0 X X X X A B 30 3 0 m 10 ft 35 3 5 m 11 5 ft 40 4 0 m 13 ft 45 4 5 m 14 75 ft 30 3 0 m 10 ft 35 3 5 m 11 5 ft 40 4 0 m 13 ft 45 4...

Page 24: ...Intentionally left blank...

Page 25: ...Intentionally left blank...

Page 26: ...Intentionally left blank...

Page 27: ...FZ LLC 2 FH WK ORRU 4 XLOGLQJ 1RUWK 7RZHU Dubai Science Park Al Barsha South P O Box 11488 Dubai United Arab Emirates Direct 971 487 48053 Fax 971 487 48072 Email Info ME arjo com NEDERLAND Arjo Nede...

Page 28: ...QRPLF SDWLHQW KDQGOLQJ SHUVRQDO K JLHQH GLVLQIHFWLRQ GLDJQRVWLFV DQG WKH H HFWLYH SUHYHQWLRQ RI SUHVVXUH XOFHUV DQG YHQRXV WKURPERHPEROLVP ZH KHOS SURIHVVLRQDOV DFURVV FDUH HQYLURQPHQWV WR FRQWLQXDOO...

Reviews: