commissioning
FIRST IGNITION OPERATION
1. Check the electrical supply.
Complete (Y/N)
. . . . . . . . . . . . . .
Date
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installer
. . . . . . . . . . . . . . . . . . . . . . . . . .
. Check the type of gas and
change the gas if necessary.
Complete (Y/N)
. . . . . . . . . . . . . .
3. Check the gas tightness.
Complete (Y/N)
. . . . . . . . . . . . . .
16. Check the boiler
combustion.
Complete (Y/N)
...........................................................................
4. Check the flue installation.
See flue section….
Complete (Y/N)
. . . . . . . . . . . . . .
5. Fill the installation
and complete flushing
procedure. See page 6
Complete (Y/N)
......................................................
6. Check return filter for debris
and clean if necessary
Complete (Y/N)
. . . . . . . . . . . . . .
8. Spin the pump.
Complete (Y/N)
. . . . . . . . . . . . . .
9. Manually vent the heat
exchanger or press Esc
button
Complete (Y/N)
. . . . . . . . . . . . . .
9. Change the language in the
display (if necessary - page
30).
Complete (Y/N)
...........................................................................
10. Set the hour, and the date.
See Page 30
Complete (Y/N)
. . . . . . . . . . . . . .
11. Set the heating power. See
Pages 8 & 30
Complete (Y/N)
. . . . . . . . . . . . . .
1. Balance the central
heating circuit. See Page 30
Complete (Y/N)
. . . . . . . . . . . . . .
13. Check the operation of
DHW.
Complete (Y/N)
. . . . . . . . . . . . . .
14. Adjust DHW flow rate on
the boiler.
Complete (Y/N)
. . . . . . . . . . . . . .
15. Measure the gas inlet
working pressure
Complete (Y/N)
...........................................................................
18. Explain to the end user
how to use the boiler timer
and controls.
Complete (Y/N)
. . . . . . . . . . . . . .
19. Fill in the log book. See
pages 65 and 66.
Complete (Y/N)
. . . . . . . . . . . . . .
17. Gas rate the appliance.
Complete (Y/N)
. . . . . . . . . . . . . .
7. Check the hydraulic water
tightness.
Complete (Y/N)
. . . . . . . . . . . . . .