05/10/11
Page 8 of 21
378 7983
16. Run the main black wire to a suitable
earth.
17. Connect the main power wire (red) to
the positive terminal of the battery.
(Main battery if a dual battery system is
installed)
18. Using the cable ties supplied, secure
the loom being sure to keep clear of
any hot, sharp or moving surfaces.
19. Remove the protruding bracket in front
of the radiator, as it is no longer
required (note: the vertical member of
this bracket must not be removed as it
holds the bonnet latch in position). This
may be done by either drilling out the
existing spot-welds with a 5mm drill as
shown, or by cutting it off with a grinder.
Re - locate the air temp sender (if fitted)
to one of the holes in the vertical
bracket.
Paint exposed metal to prevent rusting.
CABLE TIE
LOOM