Aquaprobe
®
AP-700, AP-800 & AP-2000 Instruction Manual
10401-00870 Rev R
5.
Select
Full Cal.
The screen will change to:
Calibration
pH/REDOX(ORP)
DO/EC
Aux Electrodes
6.
Select
Aux Electrodes
. The screen will change to:
SELECT ELECTRODE
1:Rhod
l
4:N/A
2:EMPTY
l
5:N/A
3:N/A
l
6:N/A
The Rhod electrode should have been assigned to AUX socket 1 when it was fitted. Press
the OK or right arrow key to select Rhod. The screen will change to:
CALIBRATE Rhod
ZERO? [01/Jan/17]
Pt-2? [01/Jan/17]
GS Factor:01.00
Calibration point 2 (Pt-2) is the upper calibration point.
The dates shown to the right of each point are the dates of the last successful calibration.
7.
Select ZERO. The screen will change to:
PLEASE WAIT
Stabilising
000%
The Meter will wait until the readings are stable, then it will send the calibration command
to the Probe, where the calibration takes place. During calibration, the Calibrating screen is
displayed and the progress counter counts up. If the calibration is successful, the counter
will reach 100% and the following screen will be displayed.
Output:2500mV
Calibrating
100%
Press [OK]
The Calibration Report on the top line displays the voltage output from the electrode in
millivolts (mV). This value is not stored in memory so should be noted down in a calibration
record book for the probe.
© 2017 Aquaread
®
Ltd.
www.aquaread.com
Page 76 of 141