Page 18

Check for leaks and if all is sound refit the 

shower head to the fixed arm and push the

cover plate into position flush with the finished

wall surface.

8

Summary of Contents for Quartz QZ.A1.BR.05

Page 1: ...Quartz Digital Concealed with adjustable height and fixed head Installation guide Quartz Digital Concealed installation instructions Page 1 ...

Page 2: ...gital Concealed Quartz Digital concealed standard with fixed head QZ A1 BR 05 Quartz Digital concealed pumped with fixed head QZ A2 BR 05 Quartz Digital concealed standard with adjustable head QZ A1 BV 05 Quartz Digital concealed pumped with adjustable head QZ A2 BV 05 ...

Page 3: ...Quartz Digital Concealed installation instructions Page 3 Components HP Combi Components HP Combi Components Gravity Components Gravity ...

Page 4: ...stalled in situations where either the ambient temperature is likely to exceed 40ºC or where freezing may occur The control must not be installed in situations where the ambient temperature is likely to fall below 5ºC or rise above 70ºC We do not recommend the use of Quartz Digital in steam therapy facilities This appliance must be earthed Cables which are chased into the wall must be protected by...

Page 5: ... and be of the type fitted with a fully modulating gas valve If in any doubt please contact the appliance manufacturer before installation commences PLEASE NOTE DUE TO PERFORMANCE CHARACTERISTICS OF COMBINATION BOILERS THE SHOWER FLOW RATE MAY VARY WITH CHANGES TO THE MAIN INLET TEMPERATURE INLET TEMPERATURE CHANGE MAY ALSO CAUSE THE DIGITAL CONTROLLER TO FLASH THIS IS NOT NECESSARILY CHANGING THE...

Page 6: ...ble on the outlet use copper pipe rather than plastic particularly if a diverter is used and minimise the number of elbows as the pipe inserts are very restrictive Flushing Some modern fluxes can be extremely corrosive and if left in contact will attack the working parts of this unit All soldering must be completed and the pipe work thoroughly flushed out in accordance with current Water Supply Re...

Page 7: ...y centres deviate from EN1111 and EN1287 but are deemed to be a special case Please note arrow on isolation valve to indicate direction of flow Compression fittings should not be used on inlet and outlet spigots 90mm 445mm 270mm 350mm 265mm 70mm To ensure safe operation and installation of this product the processor MUST be installed in one of the orientations shown 1 In addition to the guide belo...

Page 8: ...ath panel if more convenient If siting in the roof space ensure that freezing cannot occur and that no insulation material is placed under or over the processor Please refer to the system layout diagrams overleaf 3 THE PROCESSOR MUST BE SITED IN A POSITION THAT IS SAFELY ACCESSIBLE FOR SERVICING AND COMMISSIONING PURPOSES WHEN FITTED IN THE LOFT SPACE THE ROUTE TO AND THE AREA AROUND THE PROCESSOR...

Page 9: ...ol and mark all fixing points and the data cable entry point Remove the template and drill a Ø16mm hole at the appropriate position for the data cable 8 The data cable should be run in conduit to allow for replacement if required Drill and prepare the four wall fixings for the controller using the fixings provided 9 If installing this Quartz Digital as a replacement shower it may be necessary to p...

Page 10: ...ntroller using a small Posidrive screw driver 11 Connect the outlet pipe to the mixed water outlet on the Digital processor Using pipe clips as appropriate ensure that all pipe work is perpendicular to the processor i e not putting any strain on the fittings 12 Do not solder any additional pipe work to the 15mm copper pipe from the Digital shower system as the low voltage data cable could be damag...

Page 11: ... with a secondary Digital dual switch start stop controller This can be accessed by carefully snapping and removing the entry pillar and connecting the cable as described above Connect the processor power lead to a double pole 3 amp fuse switched spur incorporated in the fixed wiring circuit in accordance with current wiring rules Ensure that this is located in an accessible dry location and not i...

Page 12: ...y set with the flow rate at either NORMAL HP or NORMAL GRAVITY mode depending on which shower system has be ordered STANDARD PROCESSORS ON BALANCED HP SYSTEMS Standard processors fitted to balanced high pressure systems may be set to NORMAL HP or for water economy ECO modes STANDARD PROCESSORS ON COMBINATION BOILER SYSTEMS For Standard Digital processors installed on combi boiler systems for optim...

Page 13: ...l as indicated When the temperature has been set to the desired position carefully replace the Digital processor lid and secure the fixing hand tight only 19 Site conditions can affect temperature settings installer to adjust as required ALL COPPER PIPE WORK MUST BE CROSS BONDED AND CONNECTED TO A RELIABLE EARTHING POINT Prepare two fixing points 642mm 655mm vertically apart using a spirit level t...

Page 14: ...t the rail into the rail end bodies taking care to engage the location slot onto the lugs 4 Fit the rail end clip into position into the top rail end body and secure the rail assembly to the wall using the screws provided ensuring the rail and rail end bodies remain firmly engaged 5 Place the rail end covers into position and push firmly into place 6 Ensure the pipe work from the processor to the ...

Page 15: ...one based lubricant 9 Remove the wall outlet cover plate and carefully slide the wall outlet onto the projecting pipe Turn to the required position and mark the screw holes on the wall face 10 Remove the wall outlet and drill and prepare the wall fixings 11 Ensure the projecting pipe is clean and lubricate again if necessary Run a thin bead of silicone sealant to the rear of the wall outlet Refit ...

Page 16: ...e the fixing bush on the pipe flush with the finished wall surface 2 Connect the hose to the wall outlet assembly after passing it through the gel hanger hose restraint if required and run the shower for 15 seconds without the handset attached to clear any internal debris which may be present 13 Attach the conical end of the hose to the shower handset taking care not to twist the hose and place in...

Page 17: ...repare the fixings using the fixings provided if suitable 4 Ensuring the fixing bush is clean and free of dust fit the 15mm O ring against the end of the fixing bush Lubricate the O ring using a suitable silicone base lubricant 5 Refit the shower arm and secure it to the wall using the screws provided 6 Remove the shower head from the arm and run the shower for a few seconds to clear any debris th...

Page 18: ...z Digital Concealed installation instructions Page 18 Check for leaks and if all is sound refit the shower head to the fixed arm and push the cover plate into position flush with the finished wall surface 8 ...

Page 19: ...l enquiries aqualisa co uk Republic of Ireland Sales enquiries 01 864 3363 Service enquiries 01 844 3212 Part No 293401 Issue 04 Jun 10 Please note that calls may be recorded for training and quality purposes The company reserves the right to alter change or modify the product specifications without prior warning Registered Trademark Aqualisa Products Limited ...