Quartz Digital Concealed
installation instructions
Page 17
Slide the fixed head arm over the fixing bush flush with the wall surface and
mark the four fixing points.
3
Carefully remove the fixed head arm and drill and prepare the fixings using
the fixings provided, if suitable.
4
Ensuring the fixing bush is clean and free of
dust, fit the 15mm O ring against the end of
the fixing bush. Lubricate the O ring using
a suitable silicone base lubricant.
5
Refit the shower arm and secure it to the wall
using the screws provided.
6
Remove the shower head from the arm and run the shower for a few seconds
to clear any debris that may be present.
7