Quartz Digital Concealed
installation instructions
Page 8
Place the Digital processor on a solid
mounting surface, mark and prepare the
fixings before securing the processor to the
mounting surface using the screws provided.
4
Flush through both hot and cold supply pipes.
5
The maximum hot water inlet temperature must be no more than 65˚C.
!
Choose the position for your Digital processor as close to the shower control
as possible.
The processor may be sited in the roof space above the proposed shower site,
in the airing cupboard or behind a screwed bath panel if more convenient.
If siting in the roof space, ensure that freezing cannot occur and that no
insulation material is placed under or over the processor. Please refer to the
system layout diagrams overleaf.
3
!
THE PROCESSOR MUST BE SITED IN A POSITION THAT IS SAFELY ACCESSIBLE
FOR SERVICING AND COMMISSIONING PURPOSES. WHEN FITTED IN THE LOFT
SPACE, THE ROUTE TO AND THE AREA AROUND THE PROCESSOR MUST BE
BOARDED TO ENSURE A SAFE WORKING ENVIRONMENT.
The optimum position for the Digital processor is in the roof space above
the shower site to take full advantage of the ease and speed of installation -
please refer to the note above.
The distance between the Digital processor and shower control must be
within range of the 10m data cable supplied.