Quartz Digital Concealed
installation instructions
Page 9
Attach the supply pipes to the Digital
processor, ensuring that the cold and hot
feeds are fitted into the appropriately
marked inlets.
6
DO NOT SOLDER NEAR TO PLASTIC
COMPONENTS.
!
Run a pipe from the mixed water outlet on the Digital processor through the
wall to the proposed siting for the shower hose outlet, fixed head or diverter
depending on the system purchased.
7
Place the paper template on the wall in the desired location for the shower
control and mark all fixing points and the data cable entry point. Remove the
template and drill a Ø16mm hole at the appropriate position for the data cable.
8
The data cable should be run in conduit to allow for replacement if required.
!
Drill and prepare the four wall fixings for the controller using the fixings provided.
9
If installing this Quartz Digital as a replacement
shower, it may be necessary to purchase a
Quartz Digital retro-fit wall plate to first cover
the existing hole in the tiling. The cavity in the
wall should be plugged using a suitable material
for the wall plate and controller to be secured to.
Contact our Customer Service Department to
purchase a chrome (part no. 223121)
retro-fit wall plate.
!