13
Low Voltage Wiring:
1. The SuperCell cable connector (75093 & 75094 only) is keyed and must be aligned to connect
properly. Line up the cell cord and plug into the cell cord connector located on the bottom right
of the AG base plate.
2. The other end of the SuperCell cable will have a red weather plug located in one of the three (3)
contact holes. The SuperCell will have two (2) electrical terminals:
As the SuperCell has two (2) electrical contact terminals, the red weather plug will seal the
unused contact in the cable.
Position the SuperCell plug to align the two open holes with the two mating cell terminals:
push gently, but firmly, to connect.
B
ASE
OF
AG
3. The Flow Switch cable is used with the 75094 “Inline-cell manifold system”. This cable connector
is also keyed and must be aligned to connect properly.
DO NOT use a flow switch jumper to circumvent the inline manifold systems flow switch. Dam-
age to the cell and power supply can occur if the unit is run without water flowing through the
75094 manifold system.
Failure to heed the following may result in equipment
damage.
CAUTION !
Flow
Switch
Cable
A Flow Switch Jumper has been provided with
your AG system to disable the water flow switch
when used with the 75093 and 75092 manifold
systems. These manifold systems do
not use a flow switch to monitor water
flow. Do not use this jumper with the
75094 “Inline-cell manifold system”.
SuperCell
Cable
INSTALLATION
Hard Wired:
Summary of Contents for 75090
Page 30: ...30...
Page 31: ...31...
Page 32: ...32 2737 24th St North St Petersburg FL 33713 1 727 823 5642...