Anchor Installation: Core-drill Retro-fit
(CONTINUED)
4.
Place the anchor in the hole and ‘dry-fit’ it first to make sure the anchor will be flush
and plumb with the finished deck surface when installed. Adjust the hole as needed.
NOTE: Pool decks with pavers or thick tiles may require other anchor options. Contact Aqua Creek Products.
5.
Inject epoxy adhesive into each hole starting at the bottom until the hole is 1/3 to 1/2
full.
NOTE: We recommend using masking tape around the top of the anchors so that no epoxy gets inside the anchors.
7.
Let the epoxy cure for at least 24 hours before installing the lift (or where applicable
according to the epoxy manufacturers’ instructions).
6.
Install the anchor into the epoxy filled hole by pushing down and twisting back and
forth to evenly distribute the epoxy around the anchor. Push down until it is flush with
the finished deck surface. Clean off any excess epoxy. Adjust the anchor as needed to
make sure it is flush and plumb with the deck surface. This should be done during the
adhesives’ specified ‘gel time’ (see epoxy manufacturers’ instructions).
1.9" X 6" ANCHOR
(AQUA CREEK OR EQUIVALENT)
SCOUT MAIN ASSEMBLY
1.9" POST
FIXING ANCHOR-TAB
1/2" X 2"
HEX BOLT &
FLAT WASHER
1" X 4"
FIXING-
ANCHOR
ANCHOR MUST BE BONDED
ACCORDING TO LOCAL
REQUIREMENTS
7