35
Required components, tools and materials
For this work step, the following components, tools and materials are required:
Air compressor
Moist cloth
Procedure
To clean the seed drill:
Step Description
Explanation
1
Empty the seed hopper, see
Emptying the seed
hopper
on page 34 for more information.
2
Remove the seeding shaft, see
Changing the
seeding shaft
for more information.
3
Turn the seed hopper lid counterclockwise to open
it.
4
Clean the inside of the seed drill and the seed
paths with compressed air.
5
Clean the outside of the seed drill with a moist
cloth.
7.4
CHECKING THE HYDRAULIC HOSES
Have the hydraulic hoses checked annually by a qualified technician. The inspection intervals to be
observed may be regulated by regional laws and regulations.
According to DIN 20066, all hydraulic hoses must be replaced after 6 years at the latest.
7.5
REPAIRS AND SERVICE
In case of failure or damage to the seed drill, please contact the manufacturer. You can find information
for this under
Contact Service
on page 5.
8
DECOMMISSIONING, STORAGE AND DISPOSAL
In this section, you will learn how to decommission the seed drill, store it for longer periods of time, and
dispose of it.
8.1
DECOMMISSIONING THE SEED DRILL
Purpose
To ensure that the seed drill remains fully functional even if it is out of operation for longer periods of time,
it is important to take precautions for storage.
Procedure
This is how to prepare the seed drill for storage:
Step Description
1
Completely remove all seed from the seed drill.
2
Clean the seed drill inside and out, see
Cleaning the seed drill
on page 34 for more information.
Summary of Contents for PS 120 M1
Page 39: ...39 9 2 2 PS WITH ISOBUS Electric fan Hydraulic fan...
Page 47: ...47 NOTES...