30
Required components, tools and materials
For this work step, the following components, tools and materials are required:
Seed
Overview
No.
Designation
1
Seed hopper lid
2
Seed hopper
Procedure
This is how to fill the seed hopper:
Step Description
Explanation
1
To open the seed hopper, turn the lid (1)
counterclockwise.
2
Fill the seed into the seed hopper (2).
3
To close the seed hopper, turn the lid (1) clockwise.
5.9
DEACTIVATING THE AGITATOR
Purpose
Use of the agitator is only required for seed types that tend towards bridging or for very light seed (e.g. for
grasses).
Requirements
The following requirements must be fulfilled for this work step:
The implement is disconnected from the power source, see
Disconnecting the seed drill from the power
source
on page 33 for more information.
Required components, tools and materials
For this work step, the following components, tools and materials are required:
Hexagon key
Drive belt
Summary of Contents for PS 120 M1
Page 39: ...39 9 2 2 PS WITH ISOBUS Electric fan Hydraulic fan...
Page 47: ...47 NOTES...