16
Overview
No.
Designation
1
Counter plate
2
Seed drill
3
Soil tillage implement
Procedure
To attach the seed drill on a soil tillage implement:
Step Description
1
Fasten the counter plate (1) on the soil tillage implement (3).
The counter plate must be parallel to the ground when the soil tillage implement is in working
position.
2
Use the lifting gear to place the seeder (2) on the counter plate (1).
3
Fasten the seeder (2) with bolts and nuts on the counter plate (3).
4.2
ATTACHING THE SEED DRILL TO A TRACTOR
Purpose
For operation on the field, the seed drill can be attached directly to a tractor.
Requirements
The following requirement must be fulfilled for this work step:
The implement is disconnected from the power source, see
Disconnecting the seed drill from the
power source
on page 33 for more information.
The tractor is designed for mounting of the seed drill
– information on this can be obtained from the
tractor manufacturer.
Required components, tools and materials
For this work step, the following components, tools and materials are required:
Suitable component for attachment (e.g. top link mounting kit or three-point loader)
Bolts M 12, strength class 8.8 or higher
Self-locking fastenings (nuts)
Lifting gear that is suitable for the mass of the respective implement version, see
Technical Data
on
page 8 for more information
Summary of Contents for PS 120 M1
Page 39: ...39 9 2 2 PS WITH ISOBUS Electric fan Hydraulic fan...
Page 47: ...47 NOTES...