APPENDIX D
SHORT, OPP AND OPC TEST
Entire Contents Copyright
2014 by Adaptive Power Systems, Inc. (APS) • All Rights Reserved • No reproduction without written authorization from APS.
44M04 LOAD MAINFRAME OPERATIONS MANUAL
Page 90 of 93
44M00
9.3
OPP Test
To invoke over power protection circuit testing of a unit under test, send the following
sequence of commands to the load:
OPP Test
In this example, threshold limits are set and the NG signal is enabled.
REMOTE
Set Remote
TCONFIG OPP
Set OCP test
OPP:START 3
Set start load watt 3W
OPP:STEP 1
Set step load watt 1W
OPP:STOP 5
Set stop load watt 5W
VTH 0.6
Set OPP VTH 0.6V
WL 0
Set watt low limit 0W
WH 5
Set watt high limit 5W
NGENABLE ON
Set NG Enable ON
START
Start OPP testing
TESTING?
Ask Testing?
1:Testing, 0:Testing End
NG?
Ask PASS/FAIL? 0:PASS,1:FAIL
OPP?
Ask OPP watt value
STOP
Stop OPP testing