
APACHE 50 PAGE # 25
Dawson’s
APPROACH E GI EERI G
AH-64A 50 MECHA ICS
17.1
Temporarily install the transmission cover on the fuse-
lage. Using 3/32” balsa cross sheet the fuselage starting just
behind the transmission. Check to make sure that the sides are
properly matched. When satisfied continue to the next step.
17.2
Continue cross sheeting the top of the tail boom to the
end of the tail boom. Cut away any sheeting by the tail rotor
control pushrod for free movement.
17.3
Cut out the ¾” x 4.6” triangle stock to match the cross
sheeting and flush with the top of the leading edge former. Glue
the triangle stock centered on the leading edge supports.
17.4
Punch out the 1/16” balsa trailing edge former, VF-5,
and glue it into the lower trailing edge slot of the vertical fin
assembly. Center and glue the ¼” brass horizontal fin tube into
the holes of the vertical fin assembly.
17.5
Punch out the two 1/16” balsa vertical fin side sheeting
VFS. Sand the leading edge at an angle so that when it is mated
with the tri-stock leading edge it will be a flush fit. When satis-
fied with the fit apply CA+ to the leading edge and glue in
place.
17.6
For ease of bending slightly wet the side sheeting. Apply
CA+ to the vertical frame and sides and bend into place. Sand
the leading edge to match the contour and to a rounded profile.
17.0 VERTICAL FI ASSEMBLY
PROCEDURE
Sand Flush
Sand to Match
Sheeting
VF
-5