18
Fig.12
Line up the runways with the bolt holes in the transverse beams and temperately bolt the screw
M18X120 and the washer D.18 in position.
Make sure the cables are routed correctly and make sure that cables on the safety rollers.
Before installation, make sure that all accessories have been installed in the
runways and transverse beams.
7.7
INSTALLATION OF COLUMNS (ref. fig. 13)
Transport the columns to the located site.
Move each column toward the respective end of the
transverse beam until stopped by the slide block on the
transverse beam. Make sure that all columns are positioned
in the correct location (ref. fig.2). Make sure to use caution to
prevent columns from falling over. If necessary, use the
shims.
Slide the safety rack down inside each column. Make sure to
slide it into the groove on the bottom of the column (ref. fig.
13).
Insert the adjustment rod through top of the column and
assemble it into the safety rack with the nuts M20. Be sure
all nuts are installed correctly as shown in the figure 13.
Insert the steel cable through top of the column