User Manual
34
4.4.1.
Holiday List
Click [Holiday List] in [TA management] menu. The following appears.
Add festivals or holidays:
Click [Append] then input the festival or holiday name and the rules. Click [Save]
when ready.
Modification of festivals or holidays:
Select the festivals or holidays you want to revise, then click [Modify] and input the
new information. Click [Save] when ready.
Deletion of festivals or holidays:
Select the festivals or holidays you want to delete, and then click [Delete] to perform
the Deletion of festivals or holidays.
4.4.2.
Timetable and Shift
The relationship between shift and timetables:
Shift setup should be done in two steps: First, setup necessary timetables. Second,
setup shifts. One or more timetables can be included in one shift.
Timetable is the time period between On-duty and Off-duty required in the company
rule. For instance, the company rule requires the working hours be 08:00-12:00 and
13:00-17:00; so 08:00-12:00 and 13:00-17:00 are two timetables. If such a shift
needs to be setup, these two timetables should be setup first. Here, we use time
table ―morning‖ to indicate ―08:00-12:00‖ and time table ―afternoon‖ to indicate
―13:00-17:00‖; so two timetables have been setup. (Please refer to the following
chapter for details of how to add time tables) and then we can add a shift such as
―Normal shift‖ in which ―shift cycle‖ and ―cycle unit‖ will be setup. Then we should
add two timetables -
―morning‖ and ―afternoon‖ so that a shift setup is completed.
Brief introduction is mentioned here for you to get a general picture of the
relationship between timetable and shift. The details of shift setup will be found in
the next two sections.
Timetable maintenance:
Click [Timetable and Shift] in [TA management] menu. The following window
appears.