Note: Please note that the average drive time of driving a pile
is about minutes. Pay attention to how long the hammer is
under vibration. Long vibration time will shorten the life of
bearings, oil seals, and hydraulic motor.
Warning: if a pile is at refusal, do not overburden the
machine to force a pile in the ground beyond the above
stated recommendations for machine usage.