13.
While driving or pulling the pile, the operation should
equalize
the
elastomer
s
evenly, at the same time, ensure the pile is vertical.
Don't side load
the elastomers or they will get hot and crack.
14. It is dangerous to
move the excavator arm while driving piles
.
15.
Please confirm that the pile driver stops completely, then open the clamp
s
.
16.
For the continuous operation of the pile driver, please take about 5 minutes
as the standard for each pile on average, and take 5-10 minutes off.
(the long-
term operation of the pile driver will increase the temperature of the
gearbox
and shorten the service life of the bearing, oil motor and seal.)
Spray water on
the bearing box when hard driving for long periods of time to cool it down.
17.
Do not operate the pile driver in bad weather.
18.
When pulling sheet pile
s
, the clamping
jaw
shall be clamped in the
middle of
the steel sheet pile.
P29
Summary of Contents for AT 75 B
Page 1: ...2021 Operation Manual Side Grip Vibro Hammer...
Page 10: ...1 1 2 3 4 5 6 7 8 9 10 P8...
Page 11: ...1 4 Specification 1 4 1 Product Dimensions P9 102 12 inches 51 49 inches 50 23 inches...
Page 15: ...P13...
Page 28: ...P26...