4.2
Driving piles and extracting:
(1)
Be familiar with the jobsite, sheet pile arrangement, try to reduce
the
the need to move the excavator as much as possible.
(2)
Start the excavator, adjust the excavator and
side grip vibro.
M
ove the pile to the suitable piling position.
(
3
)
Clamping: After side rotating, vibrate a few seconds, let down pile close to the
clamp bottom, operate jaw open and close. To ensure the cylinder pressure, please keep
jaw close for 2-3 minutes, then open the jaw.
P20