P27
7.
Remove the accumulated soil at the pile head regularly. If the
pile
head is deformed, please repair it.
8.
When install
ing
or remov
ing
the hydraulic
hoses
and connectors,
please turn off the engine of the excavator and wait until the
hydraulic system internal pressure
has gone down to safe levels
. If
there is still internal
pressure, oil
can burst out in a dangerous way
if hoses are disconnected
.
to release
internal pressure
on the
excavator
, please refer to the "operation manual"
issued by
excavator
manufacturer.
9.
As for the operation of the hydraulic oil hose,
if during
high-
pressure operation
any
oil leak
s and
touches the skin or enters the
eyes,
it will cause great danger to the human body, so please wear
protective glasses and thick gloves.
10.
If
elastomer
are
crack
ed
, please do not start the machine
before replacing the
them.
11.
Check the conductor insulation, especially whether the
insulation of the power supply lead-in wire and distribution cabinet
is firm, and whether the neutral connection or grounding is good.
12.
Connecting bolts should be tight
, regularly
check
bolts as
vibration and pile driving work can lossen bolts over time.
13.
When the
hamme
is working, there should be
a
person to guide
the operator
. The guide and the operator should cross check the
signal
s
before start
ing
, during operation they should cooperate
closely.
14.
When the operation start
s
, use
an
electric
horn
or other means
to
send signals to inform the surrounding personnel to
watch out.
Summary of Contents for AT 75 B
Page 1: ...2021 Operation Manual Side Grip Vibro Hammer...
Page 10: ...1 1 2 3 4 5 6 7 8 9 10 P8...
Page 11: ...1 4 Specification 1 4 1 Product Dimensions P9 102 12 inches 51 49 inches 50 23 inches...
Page 15: ...P13...
Page 28: ...P26...