Chapter 6. Operation specifications
6.1.1 Preparation before operation
1.
Check whether the vibrator has been installed on the
vice
arm arm as required.
2.
Check whether the hose
s
are
damaged
and whether
there is
any visual
oil leakage.
3.
Check whether the controller switch is
okay
and whether
the wire harness is exposed.
4.
Check whether the lubricating oil of all parts is normal
and
whether the lubricating oil of gear box is normal.
5.
The controller power switch can now be turned to "on".
6.
Test whether the vibration controller is normal.
7.
Test whether the clamp controller is normal.
8.
Test whether the rotation controller is normal.
9.
Test whether the second vibration controller is normal.
10.
No load test ≤ 5 minutes
6.1.2 Vibration
operation
1.
Start the engine and increase the throttle slowly.
2.
Press the indicator light of the excavator to check whether
the
excavator operates normally.
3.
When
pressing
the foot pedal, the machine will vibrate with
the
first
stage
power. When the vibration motor accelerates,
the
vibration of the pile driver will increase accordingly, and the
vibration frequency will be increased to about 2800 ~ 3200 /
minute.
4.
Press
walking pedal, "the second section of vibration
confluence switch is on", and then step down
on the
pedal, at
this
time, the vibration frequency of the pile driver will increase,
and
the vibration frequency will rise to about 2800~3200
vibration
times / minute
P33
Summary of Contents for AT 75 B
Page 1: ...2021 Operation Manual Side Grip Vibro Hammer...
Page 10: ...1 1 2 3 4 5 6 7 8 9 10 P8...
Page 11: ...1 4 Specification 1 4 1 Product Dimensions P9 102 12 inches 51 49 inches 50 23 inches...
Page 15: ...P13...
Page 28: ...P26...