
4-8 High-Band Calibration
Using the PVS Software with the ME7828A
4-20
PN: 10410-00784 Rev. A
3656C W1 Cal/Ver Kit & 2300-616-R PVS UG
4-8
High-Band Calibration
During this procedure, the high-band portion of the VNA is calibrated with a full 12-term SSST
(Short-Short-Short-Thru) calibration. In
Section 4-7 “Low-Band Calibration” on page 4-17
, the low-band
portion of the VNA is calibrated with a full 12-term SOLT (Short-Open-Load-Thru) calibration.
Procedure
1.
The
W1 Verification Install Adapter
dialog box appears.
a.
Install a F-F adapter on VNA Port 1 so that a Female connector is available to the operator.
b.
Install a F-M adapter on VNA Port 2 so that a Male connector is available to the operator.
c.
When ready to proceed, click
OK
.
2.
When ready to proceed, click OK. The
VNA Calibration: Step 1 of 5
dialog box appears.
a.
Connect the Male Cal Kit Isolation Device to VNA Port 1.
b.
Connect the Female Cal Kit Isolation Device to VNA Port 2.
c.
When ready to proceed, click
OK
.
Figure 4-29.
Anritsu W1 Verification Dialog
Figure 4-30.
VNA Calibration: Step 1 of 5 Dialog
Summary of Contents for 3656C W1
Page 2: ......
Page 8: ...Contents 6 PN 10410 00784 Rev A 3656C W1 Cal Ver Kit 2300 616 R PVS UG...
Page 163: ......