IT
GB
DE
FR
ES
C
139
61
830
1_r
ev.
1.fm
- 15 -
English
Important
All handling and installation operations
should be carried out in accordance with cur-
rent legislation on health and safety at work.
If necessary, the person authorised to carry
out these operations must organise a "safety
plan" to protect the people directly involved.
The packaging is designed to reduce space and as ap-
propriate to the type of transport used.
To simplify transport, some components may be re-
moved and suitably protected and packed for transport.
The packaging carries all information necessary for
loading and unloading.
When unpacking, check that all components are
present in the correct quantities and are undamaged.
The packaging material must be properly disposed of in
accordance with legal requirements.
Different means of transport may be used, depend-
ing partly on the destination.
The chart shows the most commonly used alterna-
tives.
During transport, fix the packaging to the means of
transport securely to prevent undesirable shifting.
The appliance can be handled using fork-lift or hook
equipment of suitable load-carrying capacity.
Before lifting, check the position of the load's centre
of gravity.
Important
When engaging with the lifting equipment,
watch out for the gas supply pipe.
HANDLING AND INSTALLATION
7
INSTRUCTIONS AND WARNINGS FOR HANDLING AND INSTALLATION
PACKAGING AND UNPACKING
TRANSPORT
HANDLING AND LIFTING
IDM-39603609700.tif
Lifting devices
means of transport
IDM-3960200180.tif
IDM-39618300800.tif
Summary of Contents for 1G1FA0G
Page 122: ......