
30
6.11
Tests to be carried out after reassembly
1. The pump must start up with a supply pressure of at least 0.5 bar.
2. Make sure there are no air or paint leakages. If necessary, tighten the parts involved.
6.12
Paint filter maintenance
If the pump is properly used (a thorough cleaning should be carried out each time it is used) the paint filter
will not require special maintenance operations except those regarding cleaning and replacement of the fil-
ter.
If there is some hardened paint inside the filter or inside the paint passages, disassemble it completely,
clean it carefully and reassemble it.
Summary of Contents for MSU B193
Page 35: ...35 FIGURE 1...
Page 37: ...37 EXPLODED VIEW MOTOR BM25046...
Page 39: ...39 EXPLODED VIEW MOTOR BM20046...
Page 47: ...47 NOTE...