Installation and start-up
SPECORD
®
Connectors and display elements
The line power input connector with fuse holder and the power switch are located on the
left-hand side panel of the device.
1
Power switch
3
Power input connector
2
Fuse holder for line fuse
4
Nameplate
Fig. 6-3
Connectors on left-hand side panel
On the right-hand side panel of the device, the following connectors are located:
RS 232 and USB ports for the connection of a PC and the connectors for the xyz
autosampler and the control of the Peltier temperature-controlled cell holder.
1
RS 232 port (PC)
2
USB port (PC)
3
Connector for xyz autosampler (APG)
4
Connector for control of Peltier temperature-controlled cell holder (ACC)
5, 6
Hose conduits for coolant and waste hoses
Fig. 6-4
Connectors on right-hand side panel
The transport locking screw is located at the rear side of the device. This screw must be
removed when installing the SPECORD
®
. The optical fibers of fiber probes and the
cables for the control of the Peltier temperature-controlled cell holders can be threaded
through the opening in the lid. In normal operation, this opening should be closed with
the black cover provided to prevent the entry of extraneous light, which would distort the
analysis results.
Page 22
SPECORD
®
200/205/210/250 User's Manual – Edition 04/2005
Analytik Jena AG