
AMI Analyzer Manual
Installation Procedure
8
Violation of the National Electrical Code installation requirements may
cause a fire or explosion, with potential for serious injury or loss of life.
Installation Procedure
Figure 2. The 210BR
1. Mount analyzer in a shelter if possible, at a convenient eye level, not too close to the right wall.
The basic analyzer is designed for operation between 25
º
F and 115
º
F. It is available with a heater, which
expands its temperature range to -20
º
F, and an additional extreme weather enclosure which expands it to -
40
º
F. The gas connections are made on the right side of the analyzer, while the electrical connections are at
the bottom of the explosion proof enclosure on the left side. Explosion proof seals must be used, so be sure