PN 9000-133-VE, Rev U
Unpacking and Inspecting the Equipment
Remove any packing material from the WDG-V Analyzer shipping crate. Check
for damage. If equipment is damaged, notify the carrier and contact AMETEK
Service
(https://www.ametekpi.com/customersupport/requestsupport) immediately if
parts are missing or damage is found, and to verify if damaged parts will
require replacement prior to safely installing and operating the analyzer/
equipment.
Tools, Equipment, and Supplies Required for
Installation
To install the analyzer you need the following tools, equipment, and supplies:
• Set of open-end wrenches for fittings.
• Set of metric hexagonal wrenches.
• Set of ball drivers.
• Wire cutters, strippers, and crimpers.
• Flat blade instrument screwdriver.
• Soft, nonabrasive cloth.
• Wrist strap (for grounding).
• Detergent-based leak detector (Snoop® or another suitable leak detection
agent is permissible).
Installation and Start-Up
|
2-3
Summary of Contents for WDG-V
Page 12: ...PN 9000 133 VE Rev U This page intentionally left blank xii Thermox WDG V VC VCM VM...
Page 60: ...PN 9000 133 VE Rev U Figure 2 16 RCU Connections 2 34 Thermox WDG V VC VCM VM...
Page 93: ...PN 9000 133 VE Rev U Figure 3 4 Thermocouple replacement Maintenance and Troubleshooting 3 19...
Page 97: ...PN 9000 133 VE Rev U Figure 3 6 Flow sensor replacement Maintenance and Troubleshooting 3 23...
Page 103: ...PN 9000 133 VE Rev U Figure 3 10 Sensor board removal Maintenance and Troubleshooting 3 29...
Page 124: ...PN 9000 133 VE Rev U This page intentionally left blank 4 10 Thermox WDG V VC VCM VM...