PN 9000-133-VE, Rev U
Connecting Analyzers to the AMEVision Display Unit
Connecting a Single Analyzer
When only one analyzer is connected, set the address to “1”.
Connecting Multiple Analyzers
Up to four (4) analyzers can be connected to a single AMEVision Display User
Interface. The WDG-V Analyzer has extra terminal connections for daisy-chain
connections.
Each analyzer must have a unique address. See “Setting the Analyzer
Address Using the Dip Switch.”
Figure 2-22..1
Single WDG-V Analyzer to the
Display User Interface.
Figure 2-22..2
Multiple WDG-V Analyzers to
the Display User Interface.
Installation and Start-Up
|
2-41
Summary of Contents for WDG-V
Page 12: ...PN 9000 133 VE Rev U This page intentionally left blank xii Thermox WDG V VC VCM VM...
Page 60: ...PN 9000 133 VE Rev U Figure 2 16 RCU Connections 2 34 Thermox WDG V VC VCM VM...
Page 93: ...PN 9000 133 VE Rev U Figure 3 4 Thermocouple replacement Maintenance and Troubleshooting 3 19...
Page 97: ...PN 9000 133 VE Rev U Figure 3 6 Flow sensor replacement Maintenance and Troubleshooting 3 23...
Page 103: ...PN 9000 133 VE Rev U Figure 3 10 Sensor board removal Maintenance and Troubleshooting 3 29...
Page 124: ...PN 9000 133 VE Rev U This page intentionally left blank 4 10 Thermox WDG V VC VCM VM...