Maintenance
|
6-3
Hazardous Location Applications:
If an external, flame-proof disconnect switch (breaker) has been installed,
close the breaker. If no external breaker has been installed, follow the power
up procedure for “General Purpose (GP) Applications” below.
Before proceeding, test the area around the analyzer for flammable
gases. If an explosive gas atmosphere is present, do not power down
the analyzer or any alternate power sources that supply power to
the analyzer components. Proceed only when the area is found to be
safe.
When the analyzer doors are open, take appropriate precautions to
avoid electrical shock. Hazardous voltages are present inside.
4. Close the analyzer enclosure doors and secure them with their latches to al
-
low the analyzer to warm up to operating temperature and stabilize.
5. check the System Time and system Date (System screen, SETUP menu)
and set them to the current time and date.
Summary of Contents for 5100 HD
Page 23: ...Overview 1 11 Space Coupled Option Schematic...
Page 24: ...1 12 Model 5100 HD Analyzer This page intentionally left blank...
Page 39: ...Installation Start Up 3 11 I O Signals...
Page 50: ...3 22 Model 5100 HD Analyzer This page intentionally left blank...
Page 100: ...5 16 Model 5100 HD Analyzer This page intentionally left blank...
Page 120: ...6 20 Model 5100 HD Analyzer...