Maintaining Units
128
3ware 9000 Series Serial ATA RAID Controller User Guide
The Scheduling Page appears, showing the schedule for Rebuild/Migrate
Tasks.
2
To view Verify Tasks, select it from the drop-down list at the top of the
page.
3
In the Schedule Rebuild Tasks section, select the appropriate setting:
Follow Schedule
or
Ignore Schedule
.
The illustration below shows this setting for the rebuild task schedule.
Note:
Self-test schedules cannot be turned off in this way. To disable self-tests
you must either remove all schedule times, or uncheck the tests listed in the
Tasks
column. For more information, see “Selecting Self-tests to be
Performed” on page 129.
Removing a Task Schedule
When you first use 3DM, daily task schedules are defined, each starting at
12:00 am and running for 24 hours.
A maximum of seven schedules can be defined. When seven schedules are
shown for any of the tasks, you must remove a schedule before you can add
another.
To remove a task schedule
1
Choose
Management > Schedule
from the menu bar.
The Scheduling Page appears, showing the schedule for Rebuild/Migrate
Tasks.
2
To view Verify Tasks or Self-test Tasks, select it from the drop-down list
at the top of the page.
3
Select the checkbox next to the schedule(s) you want to remove.
4
Click the
Remove Checked
button.
The page refreshes, and the selected schedule(s) are removed. You can
now add another schedule.
Summary of Contents for 3ware 9000 Series
Page 1: ...3ware Serial ATA RAID Controller Supports the 9000 Series PN 720 0114 01 March 2005 User Guide...
Page 10: ...About This Guide 4 3ware 9000 Series Serial ATA RAID Controller User Guide...
Page 88: ...Configuring Your Controller 82 3ware 9000 Series Serial ATA RAID Controller User Guide...
Page 144: ...Maintaining Units 138 3ware 9000 Series Serial ATA RAID Controller User Guide...
Page 190: ...Glossary 184 3ware 9000 Series Serial ATA RAID Controller User Guide...
Page 202: ...196 3ware 9000 Series Serial ATA RAID Controller User Guide...