![AMCC 3ware 9000 Series User Manual Download Page 133](http://html1.mh-extra.com/html/amcc/3ware-9000-series/3ware-9000-series_user-manual_2921145133.webp)
Scheduling Background Tasks
www.3ware.com
127
Turning On or Off Use of a Task Schedule
Turning on the schedule for Rebuild/Migrate and Verify tasks forces rebuilds,
migrates, and verifies to be performed only during the time specified by the
schedule. If the schedule is not turned on, rebuilds, migration, initialization,
and verify can happen whenever they are required, are manually started, or if
the 'Auto-verify' policy is enabled for a particular unit (verifies only).
There may be times when you want to disable scheduled rebuild/migrate or
verify tasks, so that you can rebuild, migrate, or verify a unit right away,
without waiting for the next scheduled time. In this case, you can disable the
schedule, as described below.
Note:
When you first use 3DM, daily schedules exist with 24 hour
duration—that is, the schedule is for “all the time.” Until you
change these 24-hour daily schedule, enabling the schedule will
not have any direct effect.
You can easily disable a current Verify or Rebuild schedule without deleting
the schedule itself.
To turn on or off use of the current Verify or Rebuild task schedule
1
Choose
Management > Schedule
from the menu bar.
Summary of Contents for 3ware 9000 Series
Page 1: ...3ware Serial ATA RAID Controller Supports the 9000 Series PN 720 0114 01 March 2005 User Guide...
Page 10: ...About This Guide 4 3ware 9000 Series Serial ATA RAID Controller User Guide...
Page 88: ...Configuring Your Controller 82 3ware 9000 Series Serial ATA RAID Controller User Guide...
Page 144: ...Maintaining Units 138 3ware 9000 Series Serial ATA RAID Controller User Guide...
Page 190: ...Glossary 184 3ware 9000 Series Serial ATA RAID Controller User Guide...
Page 202: ...196 3ware 9000 Series Serial ATA RAID Controller User Guide...