Pega 367 with Fanuc 04PC User Pre-installation Guide
©Amada America, Inc.
Print Date 03/07/2001 Revision 4.0
This document available on the World Wide Web at http://www.amada.com
Page 27 of 35
Drilled Hole with Anchor Rod and Adhesive Mounting Procedure
Step 1.
Drill the four Anchor Rod holes in the existing floor.
The holes should be drilled approximately 6” deep.
See Alternative Floor Bolt Mounting Method Plan View (Drilled Hole with
Adhesive Anchor Rod) for correct layout dimensions.
Existing Floor
Step 2.
Set the Amada Machine Leveling Plates over the drilled holes
Existing Floor
Step 3.
Step 4
Set the machine on the machine leveling plates.
Level the machine frame by adjusting the Amada machine leveling plates.
See
Leveling the Machine
section for correct procedure.
Existing Floor