Chapter 7: Installing the Switch in an Equipment Rack
120
Figure 55. Installing the Switch in an Equipment Rack
4. Repeat this procedure if there are other switches to be installed in an
equipment rack.
5. Do one of the following:
If you have not installed the power supplies yet, go to Chapter 4,
“Installing the Power Supplies” on page 93.
If any of the switches contain the AT-PWR250-80 DC Power
Supply, go to Chapter 9, “Wiring the DC Connector on the AT-
PWR250-80 Power Supply” on page 137.
Otherwise, go to Chapter 10, “Displaying the AlliedWare Plus
Summary of Contents for AT-x930-28GPX
Page 8: ...Contents 8...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 82: ...Chapter 2 Virtual Chassis Stacking 82...
Page 92: ...Chapter 3 Beginning the Installation 92...