Requirements for Application Development
Commissioning Life Cycle
shows the steps required during application program development,
debugging and commissioning.
Figure 47 - Application Development Life Cycle
Generate Functional
Specification
Create Flow
Diagram
Create Timing
Diagrams
Establish Sequence of
Operations
Develop Project
Online
Develop Project
Offline
Download to
Controller
Perform Validation
Testing on all Logic
Tests Pass?
Begin Normal Project
Operation
Make project
changes
Download to
Controller
Determine what logic has
been Changed or Affected
Perform Validation Testing
on all Changed or Affected
Logic
Yes
No
No
Verification
okay?
Make more online edits &
accept edits or make more
offline edits and download to
CTR
Develop Test Plan
Review Program with
Independent Party
Finish the Validation
Test
1
Secure PADT
1
You must periodically repeat the validation test (also known as proof tests) to make sure module inputs and outputs are functioning properly and as commanded by the
application programming. For more information on proof tests for I/O modules, see
,
Summary of Contents for 1756-L6 Series
Page 24: ...24 Rockwell Automation Publication 1756 RM001I EN P May 2012 Chapter 1 SIL Policy Notes ...
Page 76: ...76 Rockwell Automation Publication 1756 RM001I EN P May 2012 Chapter 6 FLEX I O Modules Notes ...
Page 126: ...126 Rockwell Automation Publication 1756 RM001I EN P May 2012 Appendix D Checklists Notes ...
Page 133: ...Allen Bradley Motors ...