background image

© Allegion 2020

P519-096 Rev. 01/20-a

Test/Set-up

Power the reader.

The reader will go through a power on sequence, ending with 3 green LED 

flashes combined with 3 beeper tones.

Add credentials to the access panel following the panel manufacturer’s 

instructions.

Present a supported credential to operate the reader.

Default LED indicators:

•  Short green blink indicates the credential was successfully read.

•  Continuous red indicates the credential was not read successfully.

(Optional) Configuration

Configure the reader with the mobile application.

Download the ENGAGE mobile app and follow the in-app directions. 

Configuration Options*

Card technologies

Beeper

Standby LED state

Mobile credential

Standby LED color

Credential read LED

And more

*  Not all configurations supported with all access control panels.

 

 

CE-000-012 (not included) is used for FDR.

Reader can only be commissioned for the first 2 minutes after power on.

Request custom configuration.

Contact your local Allegion sales representative or Allegion Customer Care at 

1-877-671-7011 to request custom configuration cards.

Troubleshooting

Problem

Indication

Solution

MTB reader is not powering up.

No LED, no beeps.

Check power connections and check that the power source is ON.

MTB reader fails to read credential.

Card type is not enabled.

Use ENGAGE mobile app or configuration cards to enable card type.

Card type is not supported.

Acquire a supported credential.

Mobile credential not in range.

Move device with mobile credential closer to the reader.

Power on sequence ends in 3 red 

blinks.

System failure.

Contact Allegion Customer Care and follow the prompts for Product Support at 

1-877-671-7011.

Access control panel does not 

receive data from MTB reader.

Incorrect wiring.

Ensure the MTB reader wiring is correct and matches the input standard  the 

panel is configured for.

RS-485 not in sync.

Some RS-485 panels require the reader to complete sync. Follow the access 

control panel manufacturer’s procedures for triggering a synchronization 

sequence if applicable.

MTB reader commissioning fails.

Reader can only be commissioned 

for the first 2 minutes after power on.

Disconnect power from the reader, then apply power again.

The reader was previously 

commissioned.

Apply MTB reset card to the reader within 1 minute of power on, then 

commission the reader.

The reader is still commissioned in 

another site.

Delete the reader from the other site it is commissioned in. Then apply the MTB 

reset card within the first 1 minute of power on.

ENGAGE mobile app is not 

connecting to MTB reader.

Reader is out of range.

Get closer to the reader.

Reader was reset manually with a 

reset card.

Delete the reader from ENGAGE and commission it again.

Supported Credentials

CSN, proximity, smart and Bluetooth mobile credentials are supported, and can be read by the MTB11. Visit us.allegion.com and select the products page for 

additional information on the specific technologies supported.

Android operating systems should be version 6.0 or newer. Apple operating systems should be iOS 11.1 or newer.

ULC-S319 Equipment Class I.
ULC-S319 compliance is no longer valid when any add-on, expansion, memory, or other module 

manufactured or supplied by the manufacturer or manufacturer's representative is used. ULC-S319 Listed 

PSU must be used for Canadian installations.

FCC Statement

This device complies with part 15 of the FCC rules. Operation is subject to the following two conditions: 

(1) This device may not cause harmful interference, and (2) this device must accept any interference 

received, including interference that may cause undesired operation.

Changes or modifications to this equipment not expressly approved by Schlage could void the user’s 

authority to operate the equipment.

Industry Canada Statement:

This device complies with Industry Canada licence-exempt RSS standard(s). Operation is subject to the 

following two conditions: (1) this device may not cause interference, and (2) this device must accept any 

interference, including interference that may cause undesired operation of the device. This Class A digital 

apparatus complies with Canadian ICES-003.

OSDP Secure is recommended panel communication standard.

Access Control Performance Levels - Endurance Level IV, Standby Power Level I, Attack Level I, Line 

Security Level I.

Summary of Contents for SCHLAGE MTB11

Page 1: ...20 22 800 ft 243 8 m 16 18 22 900 ft 274 32 m 16 18 22 1000 ft 305 8 m 18 22 Cable Connections Black Ground Blue Unused Brown Red LED Control Gray Tamper Out Green Wiegand Data 0 Data Orange Green LE...

Page 2: ...ble into reader 6 Install reader with upper screw In case of alternative mounting screws only a 6 diameter Pan Head Screw should be used L Lower mounting screw not required when using back plate unles...

Page 3: ...ader commissioning fails Reader can only be commissioned for the first 2 minutes after power on Disconnect power from the reader then apply power again The reader was previously commissioned Apply MTB...

Page 4: ...s de cable Negro Tierra Azul Sin uso Marr n Control de LED rojo Gris Manipulaci n Verde Datos Wiegand 0 Datos Anaranjado Control de LED verde Rosa RS485 A Y Rojo Encendido Blindado Descarga del blinda...

Page 5: ...stale el lector con el tornillo superior En caso de que se necesiten tornillos de montaje alternativos solo deben utilizarse tornillos de cabeza troncoc nica de di metro n 6 L No se requiere tornillo...

Page 6: ...e acceso para activar una secuencia de sincronizaci n si corresponde Falla la puesta en servicio del lector MTB El lector solo se puede poner en servicio durante los primeros 2 minutos despu s del enc...

Page 7: ...20 22 243 8 m 16 18 22 274 32 m 16 18 22 305 8 m 18 22 Connexions de c bles Noir Mise la terre Bleu Inutilis Brun Voyant de contr le DEL rouge Gris Inviolable Vert Donn e Wiegand 0 Donn e Orange Voya...

Page 8: ...ez le lecteur avec la vis sup rieure Si les vis de montage doivent tre substitu es utilisez seulement une vis t te cylindrique n 6 L La vis de montage inf rieure n est pas n cessaire lors de l utilisa...

Page 9: ...isation le cas ch ant La mise en service du lecteur MTB choue Le lecteur ne peut tre mis en service que pendant les 2 premi res minutes apr s la mise sous tension D branchez l alimentation du lecteur...

Reviews: