![All Safety Products Fleet Shower SH1 Series Manual Download Page 13](http://html1.mh-extra.com/html/all-safety-products/fleet-shower-sh1-series/fleet-shower-sh1-series_manual_2897826013.webp)
Figure 13
April 1999
Page 13 of 17
Fleet Shower Model Assembly Instructions
STEP 13. FRESH WATER INLET PLUMBING (cont.).
Drill a 1 1/8" diameter hole. Using the fresh water hose connector as a
drill guide, position it in the hole on the outside of the rear panel and
drill two 13/64" holes. It's best to drill the holes on a horizontal plane
for a good visual appearance. Rivet the hole closest to the shower
tower from the outside using a PC-000102 rivet PC-000106 back-up
washer the other hole is riveted when the plastic housing is installed.
Apply Teflon tape to the threaded end of the elbow and thread it to the
1/2" FPT on the fresh water hose connector. Next slide two #12 clamps
on to the 3/4"ID x 3 1/2" long hose and force both hose ends over the
hose barbs of the straight and elbow fittings and tighten the clamps.
Position the plastic cover over the fresh water plumbing components.
Hold the cover level and drill four 13/64" holes, one in each of the
corners of the flange of the housing as shown in figure 12. Rivet from
the inside using PC-000102 rivets and PC-000106 washers on the
outside. Drill a 13/64" hole using the fresh water hose connector as a
guide through the right side flange of the plastic cover and rivet from
the inside using a PC-000102 rivet and PC-000106 back-up washer.
STEP 14. CLOTHES HOOKS, SHOWER CURTAIN AND HANGING ROD:
There are two clothes hooks located on the
inside left and right diagonal corners. A
hook is shown on the left side in figure 13.
There is a rib towards the top on the
diagonal corner. Using the hook as a drill
guide, hold it up against this rib, towards
the door and drill two 13/64" diameter
holes. Fasten in place from the outside with
two PC-000102 rivets and PC-000106 back-
up washers on the inside. Install the other
hook on the inside right corner.
The shower curtain rod is a three-piece
assembly consisting of two flanges and
one 1" diameter x 39 ¾" long tube. Position
the flanges on the long tube. Use the
flanges as a drill guide and drill two 13/64"
diameter holes. Make these holes on a
vertical plane, top to bottom, for more strength. Rivet in place from the
inside using PC-000102 rivets and PC-000106 back-up washers on the
outside. Make sure the long tube is level. Drill and rivet the other
flange in place. Add the shower curtain hooks to the shower curtain;
slip them over the curtain rod and snap in place.