16
SW-375 DC OPERATOR PLACEMENT
AND ARM LAYOUT (CONTINUED)
Step 3:
Ÿ
Measure the distance between point
Y
Z
and point . Divide this number in half.
Ÿ
This number is length of the primary arm section in the next step.
Ÿ
Please be exact.
CENTER OF HINGE
BRACKET
CENTER OF
OPERATOR
SHAFT
X
X
POINT
Y
POINT
Z
Step 4:
Ÿ
Cut the primary arm section the measurement you recorded in Step 3 (half the distance between point
Y
and
point .
Z
Ÿ
The secondary arm makes up the rest of the arm length to the gate bracket and does not need to be
measured exactly.
+
PRIMAR
Y ARM SECTION
+
CENTER OF
OPERATOR
SHAFT
CENTER OF BOLT
WHERE ARMS
CONNECT
SECONDARY ARM
GATE IN CLOSED POSITION
36VDC MANUAL (09.2020)
Monday, August 31, 2020 8:57:58 AM