13
SW-375 DC CONCRETE PAD INSTALLATION
TOP VIEW
FRONT VIEW
30”
40”
31.5”
14.75”
18”
11.5”
OPERATOR PLASTIC
COVER
OPERATOR FRAME
6 RED HEAD BOLTS
3/4” X 5”
AREA FOR CONDUIT(S)
OPERATOR CONCRETE PAD
11.5”
30”
4”
20”
24.5”
LOW VOLTAGE CONDUIT
HIGH VOLTAGE CONDUIT
FOOTING FOR
GATE OPERATOR
INSTALL 4” ABOVE GROUND
(WHEN POSSIBLE)
36VDC MANUAL (09.2020)
Monday, August 31, 2020 8:57:57 AM