background image

ALBISTONE

®

 G1 BENEFIT/G1 PLUS Skimmer Pools / 

 

27

11.

Electrical Wiring

HEA

T PUMP

C

OUNTER

-

FLO

W

FIL

TRA

TION 

MO

T

OR

PO

WER SUP

-

P

LY

C

ONTROL CIRCUITS

PO

WER CIRCUITS

FIL

TRA

TION 

C

ONT

A

CT

OR

LIGHTS REM

C

ONTROL

HEA

T PUMP

 

C

ONT

A

CT

OR

LIGHTING

SAL

T SYSTEM 

SOCKET

EXTERNAL SOCKET

SAL

SYSTEM

Ke

y

FI1 - cir

cuit br

eak

er 25/4/0

.03

FA1 - filtra

tion cir

cuit br

eak

er accor

ding to pump output C6/1, C4/1

KM1 - filtra

tion contactor

FA2 - hea

t pump cir

cuit br

eak

er C16/1

FA3 - counterflow cir

cuit br

eak

er C10/3

KM2 - hea

t pump contactor

FA4 - lighting transf

ormer cir

cuit br

eak

er C2/1

FA5 - sock

et br

eak

er - salt system C6/1

TR1 - sa

fety transf

ormer 230V/12V

FU1 - fuse insert 2A

NF1 - light r

emote contr

ol

NF2 - salt system contr

ol unit

FA6 - external sock

et br

eak

er B16/1

Xl-1 salt system power supply terminal

Drawn by: Jiří Ungr

Da

te: September 20

, 2016

Title: S

witchboar

d A

O

-2-

D

Reviewed by: Jindřich Sobotk

a

Da

te: September 22, 2016

Appr

oved by: Daniel Rychvalský

Da

te: September 23

, 2016

Type: 

F/SD/T

Č/P/NaCl

ALBIX

ON a. s.

Number o

f sheets: 1

Sheet no.: 1

Upda

ted:

Mar

ch 3

, 2020

Device with pr

ogrammed SAL

T SYSTEM

Summary of Contents for ALBISTONE G1 BENEFIT

Page 1: ...Skimmer pools ALBISTONE G1 BENEFIT G1 PLUS Version 12 10 2020 Update 31 07 2021 L V Preparation for construction www ALBIXON com...

Page 2: ...om 1 Contents 2 2 Surveying and Excavation 3 3 LevellingtheBottomoftheExcavationandDrainageoftheFoundationSlab 8 4 Concreting of the Foundation Slab 10 5 Notification of Readiness for Construction 11...

Page 3: ...ut of the Pool Excavation Width and Length for the Pool The width and length of the excavation for the pool for the pool placed by a crane 500 mm on each side counted from the outer dimension of the p...

Page 4: ...f the pool 4250 mm 6250 mm 8250 mm L2 foundation slab length 4700 mm 6700 mm 8700 mm L3 excavation length 5250 mm 7250 mm 9250 mm S pool width 3000 mm 2700 mm 3450 mm S1 outer width of the pool 3250 m...

Page 5: ...of the roof This is due to the need to protect the shaft from rainwater If you do not want to have the shaft elevated above the final surface level adequate drainage of rainwater must be provided aro...

Page 6: ...ewage and rainwater system on the premises This will enable the drainage pump and pool technology to be connected directly to the drainage which gives you more comfort in pool maintenance for example...

Page 7: ...ow body placed on the pool shell This is to achieve the lowest power losses The maximum distance from the exterior contour of the pool shell is 2000 mm If the counterflow is not aligned with the axis...

Page 8: ...age pump shaft serves as a sump for collecting groundwater and rainwater It must be provided with a submersible pump This pump must trigger automatically when the water level in the shaft rises and mu...

Page 9: ...olisinslopingterrain or afterbeginningtheearthworks itisfoundthatit hasaclaysubsoil whichmeansahigherprobabilityofgroundwateranditsexercisingof pressureonthepoolbody werecommendthatyouhaveageologicals...

Page 10: ...using a rebar mesh with the dimensions of 100 x 100 x 6 mm It is not necessary to reinforce the foundation slab under the technology shaft 4 Second Layer of Concrete Preparation for Final Layer Now po...

Page 11: ...s trees Choose the type of crane to order accord ing to the weight of the pool and the reach at which the pool is to be placed With great er reach required the lifting capacity of the cranes diminishe...

Page 12: ...on 4 Complete installation of the pool technology Installation of technology and its interconnection via pipes with the pool shell In order to interconnect the pool and the technology shaft correctly...

Page 13: ...you check the wall perpendicularity and flatness and the overall shape of the pool and its diagonals frequently We recommend that the shell should always be braced at the points where reinforcing ele...

Page 14: ...he diagonals of the pool shell In case of any deviation immediately stop the concreting operation and level the shell Concreting is carried out in layers keeping the height of a single layer of concre...

Page 15: ...between the edge of the shaft wall and below the cover These measures are the responsibility of the user Pipes around the technology shaft or to the service room must be laid in a sand bed with a mini...

Page 16: ...tslevelling This plate should be made of monolithic concrete reinforced with rebar mesh 100 x 100 x 6 mm The height of the base plate depends on the height of the type of paving that is chosen Make th...

Page 17: ...m Thermal insulation extruded polystyrene 30 mm Draining pipe Concrete reinforced with rebar mesh Backfill with gravel grain size 8 to 16 mm Backfill with soil Concrete Gravel Raised terrain Dry bulk...

Page 18: ...he edge Mirelon concrete paving concrete crushed aggregate edge tube permanently elastic sealant reinforcing wire slid through the edge Mirelon concrete paving concrete crushed aggregate support prism...

Page 19: ...the values and parameters specified in the report 2 Remeasuring will be carried out by an authorised person in the construction industry the parameters specified in the report are the responsibility o...

Page 20: ...n the report are the responsibility of the authorised person 3 Remeasuring will be made by the ALBIXON a s engineer this service will carry a charge of CZK 5 000 Submission of this duly completed and...

Page 21: ...west passage point gates trees The type of crane or dered according to the pool weight and the reach at which the pool is to be placed Units Units Photo documentation of the preparation for the constr...

Page 22: ...ng to the light earth strip FeZn 30x4 wire 8 mm main protective connection supply cable from the house switchboard c able for connection of filter pump and water management heat pump two cables electr...

Page 23: ...P TO 20M IF THE DISTANCE IS LONGER THE CABLE MUST BE OVERSIZED THE SUPPLY CABLE FROM THE HOUSE SWITCHBOARD TO THE TECHNOLOGY SHAFT MUST BE PROVIDED BY THE CUSTOMER BEFORE THE ORDERED COMPONENTS ARE DE...

Page 24: ...5 The heat exchanger must be connected to the main protective connection HOP Cables for electric heating n CYSY 5 J x 2 5 cable for 3kW heating and 6A 3 B circuit breaker in pool switchboard n CYSY 5...

Page 25: ...circuit breaker C16 1 KM2 heat pump contactor FA3 counterflow circuit breaker C2 1 FA4 lighting transformer circuit breaker C6 1 TR1 safety transformer 230V 12V FU1 fuse insert 2A NF1 light remote con...

Page 26: ...iltration contactor FA2 heat pump circuit breaker C16 1 FA3 lighting transformer circuit breaker C2 1 FA4 external socket breaker B16 1 TR1 safety transformer 230V 12V FU1 fuse insert 2A KT1 filtratio...

Page 27: ...aker C16 1 FA3 counterflow circuit breaker C10 3 KM2 heat pump contactor FA4 lighting transformer circuit breaker C2 1 FA5 socket breaker salt system C6 1 TR1 safety transformer 230V 12V FU1 fuse inse...

Page 28: ...n salt system and heat pump contactor KT1 salt system filtration and heat pump relay timer NF1 light remote control Xl 1 salt system power supply terminal X1 2 filtration motor power supply terminal D...

Page 29: ...ALBISTONE G1 BENEFIT G1 PLUS Skimmer Pools 29 Notes...

Page 30: ...30 ALBISTONE G1 BENEFIT G1 PLUS Skimmer Pools Notes...

Page 31: ...ALBISTONE G1 BENEFIT G1 PLUS Skimmer Pools 31 Notes...

Page 32: ...BIXON Call centre 477 07 07 11 www ALBIXON com The photographs used in this manual are for illustrative purposes only Typesetting and printing errors reserved Thank you for using the products by ALBIX...

Reviews: