ALBISTONE
®
G1 BENEFIT/G1 PLUS Skimmer Pools /
21
Notification of Readiness for Construction
Purchase order number
Customer’s name and surname
Address
Dimensions of the pool ac-
cording to the purchase order
Width
Length
Depth
Units
Empty field for drawings of any obstacles:
The distance between the excavation
and the place reachable
by a vehicle carrying the pool
Clearance of the narrowest
passage point (gates, trees,…)
The type of crane or-
dered according to the
pool weight and the
reach at which the pool
is to be placed.
Units
Units
Photo documentation of the preparation for the construction
Excavation
Foundation
slab
Drainage
set
Space to install technolo-
gy shaft
Surroundings
of the excava-
tion
Other
Photo documentation of the driveway from the road to the excavation site
Access road
Entrance
to the property
Parking place
for the vehicle
with the pool to
install
Please send this form along with complete photo documentation to:
Form
10.