![Alarko CARRIER ALM 125/2 Manual Download Page 10](http://html1.mh-extra.com/html/alarko/carrier-alm-125-2/carrier-alm-125-2_manual_2888491010.webp)
10
Fix the burner by pushing its diffuser group (10) through the boiler
connection flange (4) Then loosely fix the nut (1) on the stud (8). (See figure
6). The hinge piece (2) on the burner is coupled with the hinge on the
connection flange (4) by aligning with the hinge rod (3).Then nut (1) is
tightened (See figure 7).
PUSHING FORWARD AND PULLING BACK
The pulling operation is performed
until the burner rest on the hinge
protrusion smoothly (See figure 8).
By this way, the burner can be
adjusted to a maximum point on the
right hand side without hitting its
diffuser disc to any adjacent part
(See figure 9). The operation of
pushing forward will need to be
performed carefully in reverse order
to the pulling back until the diffuser
is seated in place correctly.
Figure 6
Figure 7
Figure 8
Figure 9