10.1 Control panel
The unit AWS YOSHI has the possibility to vary the capacity delivered, in a range between 25%
and 100% of rated power, as a function of the return water temperature on the primary circuit.
The modulation of the capacity is adjusted according to a proportional band.
Just adjust the temperature set point on the user menu on the control panel, that is the parameters
"Tset" and the proportional band width (Range modulation parameter). As the return water
temperature on the primary approaches the set point, the AWS capacity is reduced of 25%. Once
the set point is reached and exceed, the system makes 6 consecutive temperature checks, one
every each 10 seconds. If, during these controls, the temperature never goes below the set point
the AWS stops.
If the optional "Plus Controller" has been installed, once the set point has been reached and the
AWS stops, the primary circulation pump halts. Otherwise, the primary circulation pump continues
to run, nevertheless the AWS system is in stand-by.
Example of modulation in heating:
The set point temperature in heating, ie the parameter "Tset heat", may vary in a range between
30°C and 48°C.
The factory settings are:
Tset heat = 44°C;
Modulation Range = 5°C
The table below shows the method of variation of the capacity and a numerical example.
AWS Capacity
[%]
Tset heat [°C]
Modulation
Range [°C]
Low Temperature
Modulation [°C]
Outlet
Temperature [°C]
100
A
∆
T
A -
∆
T
A + 1
75
(A -
∆
T) + (
∆
T•0,25)
50
(A -
∆
T) + (
∆
T • 0,5)
25
(A -
∆
T) + (
∆
T•0,75)
Numerical example on the minimum temperature set point
100
30
5
25
31
75
26,25
50
27,5
25
28,75
Numerical example on the maximum temperature set point
100
48
7
41
49
75
42,75
50
44,5
25
46,25
10 AWS Set Point Adjustment
Summary of Contents for AXGP224E1
Page 1: ......
Page 2: ...2 ...
Page 4: ...4 ...
Page 7: ...7 1 2 External dimensions ...
Page 25: ...25 1 12 2 Wiring example AC 230 V single phase ...
Page 26: ...26 1 13 Power supply wiring procedure 1 13 1 Wiring instruction ...
Page 32: ...32 2 2 External dimensions ...
Page 40: ...40 2 7 Outline diagram of refrigerant piping 2 7 1 Combined installation ...
Page 41: ...41 2 7 2 Stand alone installation ...
Page 59: ...59 2 13 Power supply wiring procedure 2 13 1 Wiring instruction combined installation ...
Page 60: ...60 2 13 2 Wiring instruction stand alone installation ...
Page 62: ...62 2 14 2 Wiring example AC 230V single phase ...
Page 85: ...19 11 4 HVAC installation layout AWS E1 ...
Page 86: ...20 11 5 HVAC installation E1 with proportional distribution of consumption ...
Page 87: ...21 11 6 HVAC installation AWS E1J variable flow rate no hydraulic separator AHU ...
Page 88: ...22 11 7 HVAC installation AWS E1J variable flow rate with hydraulic separator fan coil ...
Page 93: ...27 NOTE ...
Page 94: ...28 ...
Page 95: ...29 ...
Page 96: ......
Page 109: ...13 7 2 Detailed wiring diagram ...
Page 115: ...19 11 4 HVAC installation AWS E1J TWIN ...
Page 116: ...20 11 5 HVAC installation E1J TWIN proportional distribution of consumption ...
Page 117: ...21 11 6 HVAC installation AWS E1J TWIN variable flow rate no hydraulic separator AHU ...
Page 118: ...22 11 7 HVAC installation AWS E1J TWIN variable flow rate with hydraulic separator fan coil ...
Page 123: ...27 NOTE ...
Page 124: ...28 ...
Page 125: ......
Page 126: ......