HINTS:
For the installation of the PROFINET network use PROFINET compliant cable links
only!
Detailed information can be read at the following site:
(Cabling and Interconnection Technology / Order No.: 2.252)
4
Compressed air supply for all valves (connection 1)
5
Grounding connection (PE) at the valve terminal. After mechanical installation,
connect a grounding strap to the grounding screw at the left front side of the
valve terminal. This screw is marked with a ground symbol. Connect the other
end of the strap to a well grounded metal conductor.
6
Air outlet (connection 2)
7
Air outlet (connection 4)
8
Connection for external control air (connection E1). This connection is normally
sealed with a plug. Control air is drawn from connection 1. For special operating
conditions (pressure level below 3 bars), the control air can be supplied here
9
Connection for secondary compressed air supply (connection 1 right side). This
connection is normally sealed with a plug.
Secondary air supply has to be connected, if the valve terminal has an internal
pressure zone splitting (option) or if very high air flow rates are required. (see
chapter 8.4
in "
Instructions for use Valve terminal RE-46")