Page 28
TYPICAL HOOKUP
FIG 3
6.
DIMENSIONS and MOUNTING:
PC Board Dimensions: 4.8” x 5.66”
Mounting: 5 Nylon standoff snap-in feet
Hole centers: 4 at: corners spaced 4.5” x 5.26”
1 at: down 1.40”, and in-board (left) 0.960” from center of
top right corner standoff.
Recommended hole size: 0.191”
START-UP PROCEDURES
.
Do not start the air handler or water heater
until ALL air has been purged!
1. Fill the water heater or boiler, and or
storage tank with water.
2. Purge all air for the domestic water lines
by opening faucets at the remote
parts of the plumbing system.
Summary of Contents for MaxAir 100e P2
Page 43: ...Page 43 WIRING DIAGRAM P2 UNITS...
Page 44: ...Page 44 WIRING DIAGRAM P3 UNITS...
Page 45: ...Page 45 WIRING DIAGRAM P2 UNITS ALTERATIONS HEAT PUMP OPTION...
Page 46: ...Page 46 WIRING DIAGRAM P3 UNITS ALTERATIONS HEAT PUMP OPTION...
Page 51: ...Page 51 FAN COIL DIMENSIONS AND RETURN AIR SIZE LOCATION...
Page 52: ...Page 52...
Page 53: ...Page 53...
Page 54: ...Page 54...
Page 55: ...Page 55...
Page 56: ...Page 56...
Page 61: ...Page 61 2 AND 2 5 TON EVAPORATOR COIL SIZES 70 IPCE 24 30A...
Page 62: ...Page 62 SAMPLE PIPING SCHEMATICS...
Page 63: ...Page 63...
Page 64: ...Page 64...
Page 65: ...Page 65...