11
Use suspension brackets (standard supply) to hang the equipment on sufficiently-sized anchors
(provided by the building contractor).
The dimensions of suspension points are detailed in the selection software
Duplexvent
in
Design
>
AHU
placement method
, as well as in the technical specification that forms an integral part of
purchase
contract on the ventilation unit. Below you will find examples of unit suspension.
500 - 1000 Multi, 500 – 1100 MultiEco
1500 - 6500 Multi, 1500 – 5500 MultiEco,
Description:
Description:
1.
Screw rod M10 *)
1. Screw rod M10 *)
2.
Suspension bracket
2. Suspension bracket
3.
Silent block *)
3. Washer spreading the weight
4.
Washer M10 *)
4. Silent block *)
5.
Nut M10 *)
5. Washer M10 *)
6. Nut M10 *)
*) Not included in the delivery
Manipulation space
Ceiling
Two brackets integrated into the unit and
two brackets delivered separately
Four brackets delivered separately
2
3
4
5
1
2
3
4
6
5
1