19
Connect, optional equipment
•
Lead the cable
PMi
from the junction box to the manometer
PMi
;
•
Lead the hoses of the pressure measurement point
PDi
from the top side of the compartment
C through a feed-through. The shorter hose ends up after going through the feed-through.
Lead the longer hose to the nozzle of the fan
Mi
.
Connecting servo motors
Connected on delivery
•
By-pass damper (
SB
) servo motor is connected to the wiring box.
Connected on delivery, optional equipment
•
The circuit of cooler
CHW
is connected to the hydraulic kit.
•
The circuit of heater
TPO
is connected to the hydraulic kit.
•
Hydraulic
kit
LS
controlling the chiller or heater is connected to the junction box via a wiring
box;
•
Water
pump
LP
in the heating circuit is connected to the junction box via a wiring box ;
•
Cable actuating the flap
Si
is connected up to the junction box;
•
Cable actuating the flap
Se
is connected to the wiring box;
Connect:
•
Lead the cable actuating by-pass damper (
SB
) from the junction box to wiring box.
PMi
PMe
PFe
PFi
PDe
PDi
Connection of pressure sensors